Skip to main content
Starting a Brand

Is It Too Late for a Christmas Drop?

What a first drop can still make before Christmas, counted back from the lead times: four to six weeks with your own labels, two to three without, and what to leave until January.

Folded black garments being packed into a box at the BR Apparel unit in Bradford

Article

It depends on whether you want your own label in the neck. A relabelled first drop takes four to six weeks from artwork approval, so artwork approved in the first week of November lands between the end of November and the third week of December. Without your own labels, decoration and finishing only is usually two to three weeks.

Those are the honest numbers, and they count from artwork approval, not from your first email. Here is how to work back from the date you need stock in hand, what still fits before Christmas, and what is better left for a January drop.

Count back from the date you need the stock

Start with the day the garments need to be with you, not the day you want to start selling. If you are posting to customers, that day sits before the last Christmas posting dates. If you are selling at a market or a pop-up, it sits before the first one. Then take the lead time off it.

RouteLead timeCounted from
Your own woven label, care label and swing ticketFour to six weeksArtwork approval
Decoration and finishing only, no labelsUsually two to three weeksArtwork approval
Woven labels10 to 14 working days, alongside productionArtwork approval
Branded packaging4 to 6 weeks, minimum 1,000Order
Reorders on approved artworkThe same as the first runArtwork approval

What has to happen before the clock starts

The lead time starts when you approve the artwork in writing. Before that, we prepare your artwork, issue visual proofs and confirm the label folds, tag sizes and print placement. If your logo needs rebuilding as a vector file, that happens first. If you want a sample in your hand before you commit, and on a first drop we would, that comes first too.

Brand launch orders are also paid in full before production, because we are buying stock and making your labels to order. None of this is slow, but all of it sits in front of the four to six weeks, so the sooner the artwork arrives, the more of November you keep.

What still works before Christmas

  • A labelled drop with artwork approved early in November. Four to six weeks is tight, but realistic if the design is settled and you skip nothing.
  • A smaller unlabelled drop of a design you are sure of. Decoration and finishing only is usually two to three weeks. On most blanks the supplier label stays in the neck. Native Spirit garments are made with no label in the neck at all, which makes them the cleaner choice for this route.
  • Embroidered caps and beanies. Embroidery has no unit minimum, so headwear works at small quantities.
  • A pre-order. Take orders in December for January delivery, and let the money in hand set the quantity.

What to leave until January

  • Branded packaging. It is 1,000 minimum and made to order on 4 to 6 weeks, so if it is not already ordered it will not be here for a December launch.
  • A second label placement, such as a woven label on the sleeve. It is a second label design, a second run of 100, and one more thing to approve.
  • Anything you are still deciding. A brand name, a garment or a print colour changed after approval means new labels, a new set-up or a new proof, and the clock starts again.
“The lead time starts at artwork approval, not at your first email.”

Rushing costs more than it saves

The temptation in November is to skip the sample or approve a proof you are not sure about. The sample is the step that catches a weight that feels wrong or a print that sits too high, and a first drop with a mistake in it is a first drop you cannot sell at full price. If Christmas does not fit your order, we would rather tell you so when we quote than promise a date we cannot keep.

A January launch is not a lost season. It is quieter, the decisions get the time they need, and you launch with stock that is exactly what you meant it to be.

Where to go next

Every step from artwork to delivery is on how it works, and the minimums are set out in minimum order quantities explained. For winter pieces, look at the hoodies and the caps and beanies. When the artwork is ready, get your first drop quoted and we will give you the dates.

Frequently Asked Questions

  • Four to six weeks from artwork approval for a relabelled order with your own woven labels. Orders without labels are usually two to three weeks. Woven labels take 10 to 14 working days and run alongside production. Count back from the date you need the stock in hand, and remember the clock starts at artwork approval, not at the first enquiry.
  • Yes, if the artwork is approved early enough. A relabelled order takes four to six weeks from artwork approval, so artwork approved in the first week of November lands between the end of November and the third week of December. Branded packaging is different: it is 1,000 minimum on a 4 to 6 week lead time.
  • Decoration and finishing only, without your own labels, is usually two to three weeks from artwork approval. Native Spirit garments are made with no label in the neck, so they suit this route best. Embroidery has no unit minimum, so caps and beanies work at small quantities.
  • No. Reorders on approved artwork take the same time as the first run, four to six weeks with labels. If a style is selling, plan the reorder before it sells out.

Launching a clothing
brand?

Premium blanks, your own woven labels, and minimums low enough to start small. Tell us about your first drop and we will come back with honest numbers.

Get my first drop quote